Clarendon Square: Leamington Spa

 

A prestigious postcode in this Royal Spa town, this Georgian Terrace was built in 1838, the same year as Queen Victoria granted the Royal title. When we were appointed for external redecoration and repairs within this inner city conservation area, we took over a six storey block of 18 apartments that had been in a state of disrepair with no decoration for the last 10 years.

 

The scope of the works included concrete repairs, carpentry repairs, repairs to metal feature balconies and decoration to all masonry areas, sliding sash windows and all previously painted surfaces

 

Key challenges included:

  • Conservation area
  • Private residents / leaseholders intermediately placed among Warwick Housing Stock
  • Works to the dormer requiring use of an MEWP
  • Three elevations requiring full scaffold including 2 road side elevations
  • Access road and footpaths to be kept clear from congestion at all times
  • A guide dog training route
  • The 16 week project took place over the winter period

 

Overall a challenging project with through careful planning and control, and foreman Steve Powell’s friendly and open approach was delivered on time to high quality.